Site Issues & Feedback
Filter by status:
Rock Formation Discovered During Excavation
HighUnder ReviewLarge rock formation found at 6ft depth blocking foundation work
Block A - Grid D3Rajesh Kumar2025-01-12
3 photos2 commentsDRG-ST-001-R2
Column Position Clash with MEP
CriticalOpenStructural column interferes with MEP duct routing as per approved drawings
Block B - Floor 1 - Grid A2Suresh Patel2025-01-15
2 photos5 commentsDRG-AR-105-R3
Waterproofing Material Quality Issue
MediumResolvedSupplied waterproofing membrane does not match specification
Block A - BasementAmit Singh2025-01-14
4 photos3 comments
Drawing Dependency Tracking
2 open issues have triggered design revision requests. Track their status in the Design Management module.